Sewer System Management Plan (SSMP)

SSMP

The District is required to develop and implement a sewer system management plan (SSMP) under the State Water Resources Control Board Order WQ2006-0003-DWQ. The SSMP documents the District's program to properly operate and maintain the sanitary sewer system. The SSMP addresses the following elements:

  • Goal
  • Organization
  • Legal Authority
  • Operation and Maintenance Program
  • Design and Performance Provisions
  • Overflow Emergency Response Plan
  • Fats, Oils, and Grease (FOG) Control Program
  • System Evaluation and Capacity Assurance Plan
  • Monitoring, Measurement, and Program Modifications
  • SSMP Program Audits
  • Communication Program

Sewer System Management Plan 2018 (WDID: 2SSO10217) with 2020 Audit Edits - Entire Document

Sewer System Management Plan 2018 (WDID: 2SSO10217) - Body of Document, Page 1 to 51
Sewer System Management Plan 2018 (WDID: 2SSO10217) - Appendices of Document, Page 52 to 848

 

SSMP Audits

As required, the District performs an audit of the program every two (2) years; and the SSMP is updated and re-certified by the Board of Directors every five (5) years.

SSMP Audit 2022
SSMP Audit 2020
SSMP Audit 2018